Contributing

What is included in a full plans application?

What is included in a full plans application?

What’s needed for a Full Plans application A site location plan (1:1250) and block plan (1:500) Vertical section through building showing constructional details. A detailed specification for the proposed work. The relevant fee payment and estimated cost of work (where required).

What building regulations cover?

They cover all aspects of construction, including foundations, damp proofing, the overall stability of the building, insulation, ventilation, heating, fire protection and means of escape in case of fire. They also ensure that adequate facilities for people with disabilities are provided in certain types of building.

What is full plans building regulations?

A Building Regulation Full Plans application is where plans, detailed specifications, and if appropriate, structural calculations are submitted to the council. These are checked to make sure that they meet the regulation requirements and if necessary you will be asked to give more information or to alter the plans.

Does planning permission cover building regulations?

Here’s the answer: Planning permission covers the principles of development assessing whether the development will accord with local and national policies and whether it would cause unacceptable harm, for example, to neighbours’ amenities, whereas the building regulations cover the structural aspects of development and …

What is the difference between building notice and full plans?

You can apply for building regulations approval from your local authority building control service by giving a building notice. Plans are not required with this process so it’s quicker and less detailed than the full plans application. Where a new building will front onto a private street. …

How many sets of drawings are required for a full plans application?

Submitting the application Copies of scale drawings to show that the proposed work will comply with the requirements of the building regulations (two sets of drawings for domestic work, three sets for all other types of work). A set of drawings will usually consist of plans, sections and elevations of the proposal.

What are the types of Building Regulations?

Building regulations

  • 2.1 Part A: Structure.
  • 2.2 Part B: Fire safety.
  • 2.3 Part C: Site preparation and resistance to contaminants and moisture.
  • 2.4 Part D: Toxic substances.
  • 2.5 Part E: Resistance to the passage of sound.
  • 2.6 Part F: Ventilation.
  • 2.7 Part G: Sanitation, hot water safety and water efficiency.

What are building regulation drawings?

Building Regulation Drawings are a set of detailed drawings and construction details that are submitted to the local building control department and go into much more detail than the planning application drawings.

What is a full plan?

Generally, on larger new-build projects, a ‘full plans’ application will be made, meaning that full details of the proposed building works are submitted for approval before the works are carried out. In this case, a building inspector will approve the works as they are carried out by a process of inspection.

What is the difference between planning permission and building regulations?

Building Regulations set the minimum standard for the design and construction of buildings to ensure that any work has been done correctly. Planning Permissions are more about the external appearance of the building and making sure any landscaping considerations are in keeping with the local environment.

Do you need architect plans for building regulations?

Generally only a site plan needs to be prepared, although sometimes detailed plans and calculations are required to support the application. Plans are not checked for compliance with Building Regulations and no Approval Notice is issued.

What are the building regulations and what do they cover?

The Building Regulations set out what qualifies as ‘ building work ’ and so falls under the control of the regulations, the notification procedures that must be followed when starting, carrying out, and completing building work, and requirements for specific aspects of building design and construction.

How do I make a building regulations application?

There are two ways you can make a Building Regulations application, either by making a Full Plans Building Control application or by submitting a Building Notice notification. A Full Plans application will consist of detailed Building Regulations plans and full specifications of the construction details together with the appropriate fee.

What is the difference between a building notice and full plans?

Before any work can begin, you need to decide whether to make a Full Plans or a Building Notice application. With a Building Notice, it is possible to carry out the work without prior approval while a Full Plans application is where you submit plans and documents to be approved. What is a Full Plan Application for Building Regulations?

What do you need to know about building regulation proposals?

If the proposal is for a new building / extension to a site, a plan to scale of not less than 1:1250 showing: location, boundaries of site, drainage and any public sewers. The appropriate fee and estimate if required. Do my neighbours have the right to object to what is proposed in my building regulation application?